Toronto Rail Freight: CN MacMillan Yard, CPKC Toronto Yard and the US Border
Major rail hub / inland gateway · Toronto, ON · Class I service: CN, CPKC
Two Class I railroads serve the Toronto area: CN, from its MacMillan hump yard in Vaughan, and CPKC, from its Toronto (Agincourt) yard and its Vaughan container terminal. For US-Canada freight, which railroad you use decides which border crossing the car takes.
The yards
- CN MacMillan Yard (Vaughan): about 3 km long and 1 km wide between Highway 407, Keele Street, Rutherford Road and Jane Street. One of CN's four hump yards, handling over a million cars a year around the clock. CN's Toronto automotive compound at MacMillan can unload 60 auto rail cars at once and park up to 4,500 vehicles.
- CPKC Toronto Yard (Agincourt, northeast Toronto): 432 acres, 90 miles of track and 311 switches. It opened as a hump yard in 1964; the hump was closed after 2012 and the yard now switches cars on flat tracks.
- CPKC Vaughan terminal: a 770-acre container terminal on the MacTier Subdivision, opened in 1991.
Crossing the border
- Sarnia–Port Huron (CN): the St. Clair Tunnel, built in 1994 for double-stack cars, clears every freight car in North American service.
- Windsor–Detroit (CPKC): CPKC owns the Detroit-Windsor rail tunnel, which cannot take the largest cars, such as double-stacked high-cube containers.
- Fort Erie–Buffalo: the International Railway Bridge on CN's Stamford Subdivision.
Customs data moves with the railroad. Rail cargo entering Canada must be transmitted to and validated by the CBSA at least two hours before the train reaches the first port of arrival, and US CBP needs the rail carrier's advance cargo data no later than two hours before the first US port. The carrier sends it, usually with data from the shipper or forwarder, so have your commercial paperwork ready before the car is billed. Freight moving US–Canada–US in transit uses CBSA's Rail In-transit Manifest.
What shippers should know
- Pick the railroad, then the gateway. A CN routing usually crosses at Sarnia; a CPKC routing at Detroit. Car size can rule out Detroit.
- Labor risk is real. In August 2024 CN and CPKC locked out more than 9,300 employees and stopped freight across Canada until the labour board ordered a return to work. CN estimated each day of stoppage took three to five days to recover.
- Transload in the area. CN offers bulk transload for liquids, dry bulk, forest products, metals and grain in CN-served markets, and a CN-served bulk transload operates on Keele Street in Concord, inside Vaughan.
Transload facilities near Toronto
Our transload directory lists 5 rail-connected transload facilities within 40 miles of Toronto (CN MacMillan / CPKC Toronto Yard). The closest:
- Cargoflo (Euro Asia) — Concord, ON (2 mi) · Lumber, Minerals, Steel
- CN Cargoflo — Concord, ON (2 mi) · Acids, Chemicals (Dry), Chemicals (Liq)
- CN Cargoflo Warehouse — Concord, ON (2 mi) · Lumber, Steel
- CN Forest Distribution Center — Concord, ON (2 mi) · Lumber
- CN Cargloflo (Transx) — Mississauga, ON (16 mi) · Lumber, Minerals, Steel
Need one matched to your commodity? Our rail transload service shortlists facilities that handle it.
Frequently asked questions
Where is CN's MacMillan Yard?
In Vaughan, Ontario, north of Toronto, between Highway 407, Keele Street, Rutherford Road and Jane Street. It is about 3 km long and 1 km wide.
Is CPKC's Toronto (Agincourt) Yard still a hump yard?
No. It opened as a hump yard in 1964, but its hump was closed after 2012. It now switches cars on flat tracks across 432 acres with 90 miles of track.
How does rail freight cross between Toronto and the US?
Through CN's St. Clair Tunnel at Sarnia-Port Huron, CPKC's tunnel at Windsor-Detroit, or the International Railway Bridge at Fort Erie-Buffalo. The rail carrier must send cargo data to customs at least two hours before the train reaches the border.
Sources: CBSA Memorandum D3-6-6, rail pre-arrival (rev. 2025); CBSA Customs Notice 26-16 (2026); 19 CFR 123.91; CN 2023 investor day yard operations fact sheet; CN transload and distribution; Truck News, CN auto compound (2014); Wikipedia: MacMillan Yard, CPKC Toronto Yard, St. Clair Tunnel, 2024 Canada railway dispute.
See it on the map
This hub is one of 66 plotted on the interactive North American Commodity Flow Map — origins, ports, gateways and border crossings with their serving railroads.
Moving freight through Toronto?
Find transfer points in the Transload Directory or run an indicative estimate with the Rail Rate Quote tool. We do not guarantee rates — the estimator is indicative only.
Figures on this page are typical industry ranges for reference — actual loads depend on the specific car, commodity grade and railroad rules. Rate estimates are indicative only, per car; nothing on this page is a quote.